I think a topic like this already exist, but I don't understand much german, so could someone explain to me (in english please ) how the extension mechanism in a telescopic craneboom works, and if you have any pictures, please show them too
Seitenanfang Seitenende
~gast


Beiträge

Gast


Private Nachricht senden
Veröffentlicht 12.02.2009, 17:33 - 001 - in "Telescopic boom" - [3959]
i am interessted, too
Seitenanfang Seitenende (Gast)
TDKv
Dienstleister für Kranvermieter
aus Detmold
1101 Beiträge

Admin

Avatar von TDKv
Private Nachricht senden
Veröffentlicht 13.02.2009, 22:35 - 002 - in "Telescopic boom" - [3983]
Have a look at this PDF to learn more about the Telematik-System from Liebherr:
http://www.hydro-crane.com/liebherr/LIEBHERR-LINEUP6.pdf
___

Carsten Thevessen

Tabellenbücher für Kranvermieter

Vermieter-Map für Kran- & Arbeitsbühnenvermietung
Online-Karte mit mehr als 4500 Vermietern in Deutschland & Europa

Seitenanfang Seitenende
AIN_002


4 Beiträge




Private Nachricht senden
Veröffentlicht 14.02.2009, 16:08 - 003 - in "Telescopic boom" - [3985]
B...b...but, how can that cylinder in the boom be placed there when all the other extensions take place? I still don't understand that.
Seitenanfang Seitenende
~36-320


Beiträge

Gast


Private Nachricht senden
Veröffentlicht 14.02.2009, 22:28 - 004 - in "Telescopic boom" - [3986]
Hello AIN_002 !
The cylinder is positioned inside the main boom on the bottom and it doesn't change its place. This cylinder grabs the chosen extension (in german e.g. Tele 1, Tele 2 or else) and moves it into the desired position (in Liebherr cranes usually 46% / 92% or 100% of extension length). Then the cylinder locks the extension in that position and moves down again, prepares the next extension, grabs it, moves it, locks it, etc...
So the only Tele that can be moved is the one in the bottom position ! You have to think about this before chosing you working boom length and your working load.
Another method is to use steel wire ropes (sometimes even chains) to connect the extensions and move them simultaneously at once with one cylinder.
I hope this could help you. Ask again, you're welcome.

Seitenanfang Seitenende (Gast)
AIN_002


4 Beiträge




Private Nachricht senden
Veröffentlicht 14.02.2009, 22:49 - 005 - in "Telescopic boom" - [3987]
Thank you very much! I did never thought about that the cylinder could change what tele (extension) to move! That was very interesting